KLJ TOWNPLANNERS (P) LTD
Sector. 77, Greater Faridabad


 
Project Elevation ESPANA, Faridabad Top
 
Floor Plan   Top
TENTATIVE Specification for Standard flats   Top
 
Structure Earthquake resistant R.C.C. framed structure with infill brickwork.
Wall finish Internal

All internal walls plastered & painted in pleasing shades of oil bound distemper.

External  Aesthetically designed classical exterior.
Flooring Living/Dining

Vitrified Tile/Wooden flooring (Laminate).

Bedrooms Vitrified Tile Flooring / Wooden flooring (Laminate).
Balconies Anti skid Ceramic Tiles.
Toilets Dado

Selected ceramic tiles.

Flooring Anti skid Ceramic Tile Flooring.
Fitting Wash Basin, EWC, Hot & Cold Water Mixer fittings (Without Geyser).
Kitchen Flooring

Anti skid Ceramic Tile Flooring.

Dado Ceramic Tiles upto 2’-0” height above Working Platform, rest with paint pleasing shades of oil bound distemper.
Platform Working Platform in Granite top with Stainless Steel Sink.
Windows Aluminum windows or equivalent.
Doors

All Doors shall be Hardwood Frame/Quality Flush Doors.

All door shutters shall be flush type.
Water Supply

Hot & Cold Water mixing arrangement in each flats, large under ground & over-head tank with boosting arrangement.

Electrical

PVC recessed copper wiring with provision of A/c point in all rooms with convenient and adequate provision of light & power points as well as T.V. & Telephone points in all rooms.

Lifts Electrically controlled lifts with 100% power backup.
Fire system Fire protection system in accordance with the latest NBC code.
Power supply Phase connection in all flats with mandatory power back up facilities of 2 K.V.A.
Stair / passage Kota Stone Flooring.
Note:     All buildings layouts/units plans, specifications etc. Are tentative & subject to variation & modification by the developer/architect/authorities sanctioning such plans.
 
PRICE LIST & PAYMENT PLAN, SECTOR-77, FARIDABAD   Top

Basic Sales Price (BSP)

1BR : Rs.15 Lacs

2BR : Rs. 23.50 Lacs

3BR : Rs. 28.75 Lacs

PLAN – A Down Payment Plan (8 % Rebate on BSP)
At the time of Booking
10% of BSP
Within 45 Days From date of Booking
85% of BSP + EDC & IDC + Car Parking + PLC ( if applicable )
On Possession
5% of BSP+Other Additional Charges etc.

PLAN – B Construction Linked Installment Plan

At the time of Registration / Booking

Rs.1 Lac (1BR), Rs 1.5 Lac (2BR), 2 Lac (3BR)

On Allotment of Unit

 Complete 10% of BSP

On Start of excavation

7.5% of BSP + 25% of EDC & IDC

On Completion of Ground floor roof slab

7.5% of BSP + 25% of EDC & IDC

On Completion of Second floor roof slab

7.5% of BSP + 25% of EDC & IDC

On Completion of Fourth floor roof slab

7.5% of BSP + 25% of EDC & IDC

On Completion of Sixth floor roof slab

5% of BSP + Car Parking + PLC ( if applicable )

On Completion of Eighth floor roof slab

5% of BSP

On Completion of Tenth floor roof slab

5% of BSP

On Completion of Twelfth floor roof slab

5% of BSP

On Completion of Fourteenth floor roof slab

5% of BSP

On Completion of Sixteenth floor roof slab

5% of BSP

On Completion of Eighteenth floor roof slab

5% of BSP

On Completion of Brick Work in Apartment

5% of BSP + Club Membership (if applicable)

On Completion of Plaster Work

5% of BSP

On Possession

15% of BSP + IFMS + Other Additional Charges etc.

Additional Charges

 

1.   EDC & IDC

Rs. 170/- Per Sq.Ft.

 
 

2.  Power Backup ( 2KVA Mandatory)

Rs. 25000/- per KVA

 
 

3.  Club Membership (Optional)

Rs. 40000/-

 
 

4.  Car Parking

Covered : Rs. 250000/-
Open : Rs. 100000/-

 
 

5.   IFMS    

Rs. 50/- Per Sq.Ft.

 

Preferential Location Charges (PLC)

 

For First Floor 

5% of BSP

 
 

For Second Floor      

4% of BSP

 
 

For Third Floor  

3% of BSP

 
Note: -
 
1. Payment should be made by cheque / draft only, favoring “KLJ Town Planners (P) Ltd.” Payable at New Delhi.
2. In case of any upward revision of EDC & IDC by Govt. agencies in future, the same will be recovered proportionately.
3. Prices indicated above are subject to revision at the sole discretion of the company without prior notice.
4. Prices ruling on the date of booking and its acceptance by the company shall be applicable.
5. Other charges such as Stamp Duty and Registration etc. shall be payable at the time of possession.