Omaxe New Heights,
Sector - 78


 
Project Elevation -
Omaxe New Heights, Sector - 78
Top

OMAXE New Heights
Sec 78, Faridabad


2BHK @16.18* lacs,
inclusive of Lift, Power Back-up, Club, IFMS & EEC/FFC

Floor Plan   Top



s


 
Note:     All buildings layouts/units plans, specifications etc. Are tentative & subject to variation & modification by the developer/architect/authorities sanctioning such plans.
 
Specifications
 
Title Description
Structure Earthquake Resistant RCC frame structure
 
LIVING, DINNING & LOBBY/PASSAGE
Floor : Vitrified Tiles
Walls : Pleasing Shades of OBD
 
BED ROOMS
Floor : Vitrified Tiles
Walls : Pleasing Shades of OBD
 
BALCONIES
Floor : Antiskid Ceramic Tiles
 
KITCHEN
Floor :

Antiskid Ceramic Tiles

Walls :

Ceramic/Glazed Tiles upto 2 ft. above counter & OBD in Balance area.

Counter  :

Udaipur Green

Fitting/Fixtures  : CP fitting with fresh air fan, Stainless Steel Sink
 

TOILETS

Floor :

Antiskid Ceramic Tiles  

Walls :

Ceramic/Glazed Tiles till 7’0” heights, Mirror

Fitting/Fixtures  :

Towel Rail, Provision for hot & cold water system  

 
DOORS
Entrance Door : Seasoned hardwood frames with both side teak finish flush doors
Windows :

Aluminum/Wooden windows

Internal /External Door :

Flush door Shutters with Paint

 
 
ELECTRICAL : Copper concealed wiring, provision for lights, plug points in each,   Bedroom, Drawing/Dining & Lounge
 

CLUB FACILITY : Club House having facility like Swimming Pool, Gymnasium, and Indoor Games (Table Tennis, Card Room)

                                                                                                                                                                                                                                       
 

EXTERNAL FINISH : Long-lasting paint/Gritwash or equivalent

Disclaimer -: The Brand names of various products/ specifications are tentative and subject to change at the sole discretion of the company without any prior intimation to the customers in case of non-availability/ short supply or if so warranted by the circumstances.

 
PRICE LIST & PAYMENT PLAN   Top
     
Accommodation  Area ( In Sq.Ft.)  BSP In Rs. Inaugural Discount
For Limited Period 
Total Cost
2 B/R, Living, Dining, Kitchen  & Toilets 850 1703500 85000 1618500
2B/R , Living, Dining, Kitchen, Toilets+St. 1100 2181000 110000 2071000
3B/R , Living, Dining, Kitchen, Toilets + St. 1350 2658500 135000 2523500
ADDITIONAL CHARGES (One Time Payment) Mandatory
1 Car Parking-Optional  
Covered     Rs. 1,50,000/-    
2 Club Membership Free of Cost (For Limited Period )
3 Power Back Up Installation Charges Free of Cost (For Limited Period )
External Development charges & Infrastructure Development Charges (EDC & IDC) : Rs 168/- per sq. ft.

PLAN A:-
DOWN PAYMENT PLAN (12% Rebate on BSP)
AT THE TIME OF BOOKING / ALLOTMENT Rs 1.5 lac,2 lac,2.5 lac
WITH IN 45 DAYS OF BOOKING  20% including booking amt.    
WITH IN 60 DAYS OF BOOKING / ALLOTMENT 75%of BSP + 50% Additional charges 
ON OFFER OF POSSESSION 5% of BSP + 50% Additional charges+ Other Charges(If Any)

PLAN B:-
INTEREST FREE CONSTRUCTION LINKED INSTALLMENT PLAN 
AT THE TIME OF BOOKING / ALLOTMENT Rs 1.5 lac,2 lac,2.5 lac
WITH IN 60 DAYS OF BOOKING / ALLOTMENT 20% including booking amt.
ON START OF EXCAVATION 10% of BSP
ON CASTING OF STILT ROOF 10 % of BSP +50%EDC & IDC    
ON CASTING OF FIRST FLOOR ROOF 10 % of BSP
ON CASTING OF THIRD FLOOR ROOF 10 % of BSP    
ON CASTING OF SIXTH FLOOR ROOF 7.5 % of BSP  50% Additional Charges + 100% PLC (if any)    
ON CASTING OF NINTH FLOOR ROOF 7.5 % of BSP  
ON COMPLETION  OF RCC STRUCTURE 5 % of BSP
ON COMPLETION OF INTERNAL PLASTER 5 % of BSP 
ON COMPLETION OF EXTERNAL PLASTER 5% of BSP
ON COMPLETION OF FLOORING 5% of BSP +50% EDC & IDC
ON OFFER OF POSSESSION 5% of BSP+ 50% Additional Charges+ Other Charges (If Any)    
PREFERENTIAL LOCATION CHARGES (PLC)
For First Floor 5 % of BSP  (Before any Rebate)
For Second Floor 4 % of BSP  (Before any Rebate)
For Third Floor 3 % of BSP  (Before any Rebate)
Note:
1.  In case of any upward revision of EDC by Govt. Agencies in future, the same will be recovered on pro-rata basis.
2. Prices indicated above are subject to revision at the discretion of the company.
3.Prices ruling on the date of booking and its acceptance by the company shall be applicable
4. Other charges as indicated in the allotment letter shall be payable additionally.
5. Stamp Duty, Registration & other charges shall be payable before physical posession.
6. Completion Date Will Be 30 Months from the date of start of construction of the Project subject to the force -majeure conditions.
7. Cheque should be drawn in the favour of "OMAXE Ltd." and payable at Delhi/ Faridabad.
8.ECC&FFC/IFMS is Included in BSP.
 

Road Map

  Top